Engineering
 Home : Engineering : How to Join : Calculating the Cost

Calculating the Costs of the PLTW® Program

The following is a break down of equipment and materials costs for each of the PLTW® courses based on estimates. These estimates are based on several assumptions that may not be true for your school:

  • Furniture costs are based on a "bare walls" lab
  • The prices are based on 26 students per class
  • Computers are included in the equipment cost column
  • Consumable prices are based on class sizes of 26 and must be multiplied by the number of sections taught
  • Resource materials, such as textbooks, laboratory manuals, instruction software, etc., are not included in the below prices
  • All Fischertechnik items are included under the equipment costs
 

Course Abbreviations

GTT Gateway To Technology - Comprised of 5 Units
IED Introduction to Engineering Design™
POE Principles of Engineering™
DE Principles of Engineering™
   
AE Aerospace Engineering™
BE Biotechnical Engineering™
CEA Civil Engineering and Architecture™
CIM Computer Integrated Manufacturing™
   
EDD Engineering Design and Development™

 

 

 
    Copyright 2007 - 2008 Project Lead The Way. Web Site Design by Intellisites, the Smart Choice for Web Design.